October 2026

October 6, 2026

Since the last update, Brian Perry Civil (BPC) and their subcontractors completed the construction of the new pipeline between the wharfhead and the onshore pipework. The pipe was then subject to a hydrotest to confirm that it is in full working order. 

Following hydrotest, a cutover and tie-in process was followed whereby the wharfhead pipework was demolished and the new prefabricated pipework was bolted into place. Onshore the existing pipeline was cut and the new pipeline tied into the foreshore pipe (which was replaced in 2021). Since the completion of cutover and tie-in, the new pipeline has been used for all subsequent fuel discharges.

Throughout September, BPC have focussed on reinstating the site and demobilising. This has included cutting up and removing the old pipeline from the Seaview Wharf approach structure, and re-asphalting the carpark where the pipeline project was undertaken. The temporary buildings have been removed, security fences taken down, and topsoil and grass seed reinstated ready for Hutt City Council to complete the final section of the Tupua Horo Nuku shared pathway through Point Howard.

Given BPC have now disestablished from site, this will be the last update, and the website will be disestablished from early December.

This project has been a complex and significant undertaking, successfully delivered with no safety incidents. Z would like to express our sincere thanks to the local community, stakeholders, and all the contractors, suppliers, designers, and engineering consultants who played a role in bringing this project to life. In particular, we'd like to recognise the following organisations for their contribution.

·       Brian Perry Civil

·       Energyworks

·       Acme Engineering

·       Underwater Solutions

·       Clarkson Electrical

·       Taylors Contracting

·       Nautilus Pacific

·       ROV NZ

·       Earth Sciences New Zealand (formerly NIWA)

·       Pipes NZ

·       Corrosion Control Engineering

·       Delta Valves

·       Atteris

·       Aurecon

 


Image: new wharfhead pipework